5043 COMMODITY PROCESSED GOODS 5.20.2025 Award by Line Item
5044 PRODUCE & DRY FRUIT 5.20.2025 Award by Line Item
5045 GROCERY-DRY GOODS 5.20.2025 Award by Line Item
5046 CAFETERIA PAPER PRODUCTS 5.20.2025 Award by Line Item
5047

FROZEN PRODUCTS

5.20.2025 Award by Line Item
5048

CAFETERIA BAKERY PRODUCTS

5.20.2025 Award by Line Item

5050

THE PINKHAM PLAY STRUCTURE PROJECT

4.29.2025

5050 Bid Tabulation

Geometric Construction, Inc.

5052

RE-ROOFING AT GLOBAL LEARNING CHARTER SCHOOL

5.30.2025

5052 Bid Tabulation

Midstate Sheet Metal 

5053

COMPASS INTERIOR PAINT PROJECT

5.30.2025

5053 Bid Tabulation

Perfection Painting Corp 

5051 MODULAR BUILDING REPLACEMENT AT VALLEY OAK MIDDLE SCHOOL 6.6.2025

5051 Bid Tabulation

5054 MT. WHITNEY POOL HEATER REPLACEMENT & SYSTEM UPGRADE 8.5.2025

5054 Bid Tabulation

Knorr

5055 EL DIAMANTE POOL HEATER & CHEMICAL FEED SYSTEM RETROFIT 8.5.2025

5055 Bid Tabulation

Knorr

5057 SCOREBOARD AND WATER SYSTEM IMPROVEMENT PROJECTS 11.21.2025  
5058 VUSD HIGH SCHOOL AV UPGRADES 11.20.2025

5058 Bid Tabulation

Power Design Electric